Improvements will include approximately 1,955 linear feet of storm culvert in sizes varying from 15-inch to 42-inch along with 40 proposed drainage structures. The storm sewer project will connections to existing drainage facilities at various locations throughout the project site. Work will include associated items to remove and repair sidewalks, curbing, roadway and ADA ramps.