The scope of work shall consist of the removal of approximately 450 linear feet of existing concrete channel and the construction of the following: 626 LF of 30-inch RCP Storm Drain; 444 LF of 24-inch RCP Storm Drain; 216 LF of 18-inch RCP Storm Drain; and 11 EA 10 foot curb inlets.