This project will require all engineering, design, construction, and start-up services necessary to complete the immediate needs rehabilitation project, which is to improve the facility by correcting operational issues, removing hydraulic restrictions that prevent the facility from passing peak flows and to replace equipment that are near the end of their useful life and fix process and hydraulic restrictions within the plant.