The general scope is to replace the existing 45Kw natural gas generator with a new 250 Kw natural gas generator which will power the entire facility. The new generator will be located in the same position as the existing. There will be two transfer switches provided to complete the installation. The first will meet NFPA 101, Life Safety requirements, and the second will provide power to run the rest of the facility.