This project consist of the abandonment of an existing lake bottom drain, construction of new siphon drain and associated site improvements. Project includes de-watering, pressure fill and grout of existing bottom drain, grading, siphon drain construction, tree removal and erosion control. A dive team will be required for the construction of the siphon drain.