The State is seeking proposals from engineering firms qualified to perform a hazard classification analysis and to provide both short-term recommendations regarding continued operations, as well as to provide pre-feasibility level alternatives and cost estimates for rehabilitating or removing the existing dam. The consultant’s work will consist of: Evaluation of Current Condition; Simplified Potential Failure Mode Analysis; Site topographic survey; Limited geotechnical investigation; Hazard classification analysis to determine if the dam is high-hazard; Loss of Life analysis if the dam is determined to be high-hazard; Simplified flood hydrology analysis; Prepare new EAP Maps based upon the results of the breach analyses (CWB, Overtopping Breach); Recommendations regarding continued operation of project; and Report with pre-feasibility level rehabilitation alternatives analysis inc