Work to be performed under this contract includes the removal and replacement of the existing 36" CMP culvert with a new 48" HDPE culvert, with associated concrete headwalls, stream channel stabilization, sediment storage facility, bituminous pavement repairs, and miscellaneous work and cleanup, including lawn restoration.