A MANDATORY Pre-Bid Meeting will be held on Tuesday, June 15, 2010. Project involves the following work: construction of a new two-stop elevator attached to the recreation yard side of the building. This addition will include an extension of the main ground floor corridor into a new vestibule. The elevator shaft will be concrete masonry walls with metal siding. Additional work included as part of this contract will be structural steel framed roof, standing seam metal roofing, mechanical/HVAC, plumbing and electrical services.