HVAC Systems Maintenance and Repair, Power Plant
Replacement of S block cooling water coil
Scope of work to include:
All work to be completed on site.
Set up and secure work area following all OSHA safety standards and practices
Remove existing coil and disposal of coil
Provide and install new coil
Test for leakage
Remove all materials