This document has expired, therefore the above link may no longer work.
Provide all labor, materials and supervision to remove and replace two (2) closed-loop cooling towers (fluid coolers) located at 15 S. 15th Avenue, Capitol Center Building. Work to comply with the contract Scope of Work.