The Contractor must supply all the personnel and other resources necessary to inspect, troubleshoot, perform diagnostics and preventative maintenance, sequence, calibrate, repair and replace the CEMS, when necessary, designated in the equipment list in Section 1.2.1 of this RFP. The Contractor's work must comply with the Original Equipment Manufacturer specifications, and all federal, state and local regulations.