The proposed work consists of furnishing all labor, tools, materials, equipment and testing necessary for the installation of approximately 2,500 feet of 12-inch ductile iron water mains and appurtenances including gate valves, valve boxes, hydrants, fittings, couplings, replacement of existing water services, abandonment of the existing water main, 440 feet of HDPE drain piping, new drain manholes, catch basin replacements, sewer dog house manholes, sewer point repair work and including all excavation, backfill and surface restorations.