The Project contemplated consists of construction of a 130-foot diameter clarifier with an integral recycled activated sludge pumping station, aeration basin and secondary effluent structure modifications, removal of the existing underground fuel storage tank, aboveground fuel storage tank, electrical structure, yard piping and associated electrical improvements.