This project includes the demolition of the existing water cooled chiller, cooling tower, pumps and associated piping in Student center. New water cooled chiller, cooling tower and associated pumps will be installed and connected to the existing
system in the Student Center. The heating water boilers and associated pump and piping in the Science Center will be demolished. New heating water boilers, pumps and piping will be installed and connected to the existing system in the Science Center. The heating water boiler and its associated piping in Hall will be demolished. New heating water boilers and piping will be installed and connected to existing in Hall.