The project consists of the removal and replacement of approximately 2,390 linear feet of existing 8-inch sewer with new 8-inch sewer pipe, the replacement of 11 standard manholes totaling approximately 68 vertical feet, the replacement of 48 residential house connections totaling approximately 1,250 linear feet, and all erosion control, pavement restoration and traffic control measures.