The RFP Database
New business relationships start here

Bike Path


Florida, United States
Government : State
RFP
Go to the link
This document has expired, therefore the above link may no longer work.

The Contractor shall provide the necessary labor, materials, equipment, and supervision required to construct an 8' to 12' asphalt paved bicycle/pedestrian trail and associated improvements from MM14.9 to MM15.7.

All improvements shall be installed adjacent to the ocean side of U.S. 1 within the FDOT right-of-way. The trail will tie into existing bike path to the south, the Lower Sugarloaf Historic Bridge at MM15.5, and terminate on Saddlebunch Keys to the north.

    1. Home
    2. Articles
    3. Login or Register

    4. Search

    5. Add/Announce your RFP