This document has expired, therefore the above link may no longer work.
Mandatory pre-bid meeting 07/07/2010.
Demolition of existing metal building including concrete foundation and concrete surfaced parking lots and sidewalks; installation of new 12" sewer line; and abandonment of existing sewer line.