Transport, install, and remove 238 bottom barriers (10' x 100' rubber sheets) for the control of aquatic invasive clam infestation on the lake bottom. Project requires underwater divers, a barge or floating work platform, and ability to lift and transfer 300 lbs. rolls of EPDM sheeting with metal core.