The principal items of work and approximate quantities include utility pole relocation, 230,300 cubic yards of grading, 2 acres of selective grading, 930 cubic yards of ditch excavation, 2,100 square yards of high velocity erosion control mulch blanket, 180 square yards of R-4 Rock lining with filter material, 400 linear feet of subsurface drain, 37 acres of seeding and obtaining a township grading permit and inspection services.