This project includes, but not limited to, the partial realignment of an existing 8-inch vitrified
clay (VC) sewer main by installing an 8-inch polyvinyl chloride (PVC) sewer line, a new precast
sewer manhole, and connection to the existing Lanihau Sewage Pump Station via coring through the existing wet well structure; trench excavation and backfill of No. 67 aggregate and Controlled Low Strength Material; removal and reconstruction of the existing concrete sidewalk, curb and curb ramps.