The project consists of rehabilitating 1,004 linear feet of 8� sanitary sewer with a cured-in-place-pipe liner, rehabilitating 7 manholes totaling 63 vertical feet with a cementitious liner, rehabilitating one house connection, and replacing 10 house connections located in easements at the rear of properties