Area 6 Stage 4 Closure (Schedule A ) includes all grading, compacting, trenching, backfilling soils, erosion and sedimentation control, installing geosynthetic materials and pipes and any related work necessary for construction of the following features: the interim cover; the final cover subgrade; the landfill gas collection system; the final cover system; surface water management controls; erosion and sediment controls; and loading and hauling of select fill and daily cover for County operations each day.
Truck Wash Upgrade (Schedule B) includes all grading, compacting, trenching, backfilling, erosion and sedimentation control, installation of pumps, slide gates and pipes, concrete, mechanical and electrical work and any related work necessary for construction of the Work.
Leachate Forcemain Upgrade (Schedule C - Bid Alternates) includes all traffic control, pavement sawcutting, erosion and sedimentation control, excavation, trench safety system, removal of structures and obstructions, installation of drain assembly and or access port assembly, backfilling, restoration of the road surface and any related work necessary for construction at the locations described by the Contract Documents: