The project consists of the design and construction of a new central energy plant.
The plant consists of chilled water, hot water, and ice storage for Academic Villages I and II on the main campus of the University of Central Florida, Orlando, Florida. The new construction will consist of square footage to be determined. The proposal must include a typical retrofit of the existing building from DX to chilled water and a connection to the new central energy plant.
The selected Design Build (DB) team will provide design, construction documents, and construction services.