REPLACE TEMPORARY FORCE MAIN TO KEALAKEHE WASTEWATER TREATMENT PLANT
The Work includes installation of a 5,000 gallon buried holding tank (with float and warning fill controls), the realignment and connection of an existing sewer force main to the new holding tank, installation of new sewer force main (with valves and valve box) to
connect to an existing sanitary pipe for future use with permanent system, removal of existing lift station pumps, floats, and controller, replacement with new pumps, floats, controller (to be located outside of hazardous zone), and necessary electrical power and
control improvements, Supervisory Control and Data Acquisition (SCADA) elements for operations and maintenance, and the removal of approximately 7,300 feet of partially buried and shallow buried 2b diameter High Density Polyethylene (HDPE) sanitary sewer
force main and appurtenances.