The Chippewa Cree Tribe was selected for Building Resilient Infrastructure and Communities Direct Technical Assistance (BRIC DTA) initiative, to conceptualize the initial parameters for the project to include the installation of a 2-megawatt (MW) solar photovoltaic (PV) array with accompanying battery storage, and three 2 MW natural-gas-fueled generator(s). The proposed project will form a microgrid to provide power to commercial facilities and residences along Upper Box Elder Road in an area referred to as 'the corridor.' The area comprises an estimated 120 residences, Stone Child College, Rocky Boy Health Center, and Rocky Boy Police Station and Justice Center.