Remove buildup of paint containing heavy metals off existing concrete floor of F192 Aircraft Paint Hangar. Existing buildup of paint is a result of overspray accumulation during aircraft paint application. The area is indicated on the attached drawing. Existing paint to be removed must be done so in accordance with the attached specification. Replace in kind all filters and support
frame, location indicated on drawing. Work shall occur in accordance with all state and federal laws and meet all required OSHA standards for worker protections.
CONTRACTOR REQUIREMENTS:
The Contractor awarded will need to provide information to have business set up for payment. Also will need to fill out forms for Reps & Certs. If you are large business you will need to be set up on 45 days net terms and small business will be 30 days Net terms.
Pre-Bid to look at the site is scheduled on March 26, 2019 at 2:00 p.m. Central time zone. Please notify teddy.thomas@.ctr@us.af.mil 72 hours in advance by providing your full name, date of birth, state, and driver license for base access.
Award will be contingent upon approval of funds, reference checks, D&B rating, and low cost acceptable.
Teddy T. Thomas, Construction Contracts Specialist, Phone 5802137174, Email teddy.thomas.ctr@us.af.mil - Willard Vinson, Deputy Program Manager, Phone 580 213-5120, Fax 580 213-6047, Email willard.vinson.ctr@us.af.mil