**See package for full details and site visit information**
There are 13 hangars with fire suppression systems in need of varying levels of repair spread among Joint Base San Antonio (JBSA) installations. The 13 hangars are dispersed between JBSA-Lackland and JBSA-Randolph.
The contractor shall provide all personnel, equipment, tools, materials, supervision and all other items or services necessary to perform repairs of the hangar fire suppression systems at JBSA Randolph and Lackland as defined in the attached Statement of Work (SOW).Contractor shall be licensed to perform inspection, testing, and maintenance requirements on an Aqueous Film Forming Foam (AFFF), High Expansion Foam (HEF), wet-pipe fire protection, Fire Alarm Control Panels and backflow devices. Contractor shall be certified to test and report diesel engine emissions. Contractor shall perform all contract requirements in accordance with the most current edition of all applicable Federal, State, local, Department of Defense (DOD) and Air Force regulations, including, but not limited to the Unified Facilities Criteria (UFC) 3-601-02, National Fire Protection Association (NFPA) 25, NFPA standard 409, for Aircraft hangars and Government provided specifications/requirement data cited in the attached SOW.
Please respond to this RFQ by emailing response to: Keegan Hoover at E-mail: keegan.hoover.2@us.af.mil no later than 4:00pm CST, 30 August 2019 (or sooner if possible) in order to be considered timely.
Keegan Hoover, Contract Specialist, Phone 2106711735, Email keegan.hoover.2@us.af.mil