Mobilize dredge to Sturgeon Bay and dredge between the upstream and downstream limits shown on the plans. Offload and deposit the dredged materials into Barge Road / Sturgeon Bay Utilities Placement Area, as shown on the plans. Demobilize when dredging work is completed.
Mobilize dredge to Kewaunee Harbor and dredge between the upstream and downstream limits shown on the plans. Offload and deposit the dredged materials into Kewaunee Confined Disposal Facility (CDF), as shown on the plans. Demobilize when dredging work is completed.
Lisa M. May, Contract Specialist, Phone 3132263639, Email Lisa.M.May@usace.army.mil - Robert Austin, Chief, Contracting Branch, Phone 3132266819, Email robert.w.austin@usace.army.mil