The Contractor shall provide supervision, labor, material, and equipment required to perform all work for the following project: (Remove and replace vinyl flooring in following day care rooms that is a total of approximately 6,000 sq./ft. (Roombs 105, 110, 112, 113, 114, 125) All work shall be done in a manner to provide a complete, usable and finished end product.
The project shall include, but not limited to, the removal of all existing vinyl flooring specified and any other material on the concrete floor for preparation of new vinyl floor. The furniture and any other structures will be removed by the CDC or PWD prior to floor preparation. Contractor shall follow all procedures according to Navy and Marine Corps Child Development Centers (FC 4-740-14N) local laws and in accordance to section 7 and 11 of this document