COOR ISD is accepting bids for the purchase and installation of a turn-key digital
video surveillance system at COOR ISD. Surveillance system coverage will include two
physical locations: the COOR office building and the COOR Education Center/R.O.O.C.
Inc building. Bidders should anticipate and be prepared to complete installation during
the summer of 2010. COOR ISD will negotiate a contract with the selected bidder. Proposal due by 3:00 PM April 30, 2010