AMENDMENT 01: Remove & replace the Body document, Remove & replace the specification 01 27 00 & upload the site visit minutes.
The work includes the installation of a concrete mat foundation to support the installation of three (3) 10,000 gallon HDPE water storage tanks including appurtenances & accessories. Install 6.96" ID waterline piping delivery systemwupported by above ground pipe supports. Install three fire hydrant assemblies. Some electrical work is involved.
The site visit will be on Tuesday, August 12, 2014 at 9:30 am at the Zzyzx Desert Studies Center, Zzyzx, CA 92309. Take I-15 Exit 239 - travel approximately 2.5 miles southeast then due south 2 miles to the complex.
All intereste vendors must be registered at: 1) www.SAM.gov 2) www.fedconnect.com
BARBARA ESCHELS