The proposed work consists of constructing a five level traffic interchange. The work includes roadway excavation, constructing embankments, furnishing and placing aggregate base, PCCP, asphaltic concrete pavement; constructing ten cast-in-place post-tensioned box girder concrete bridges and one precast, pre-stressed Type V AASHTO girder concrete bridge; constructing retaining walls and sound walls; drainage facilities including seven box culverts, lined drainage channels, grinder station; furnishing and installing signing and pavement markings; furnishing and installing lighting, traffic signals, and surveillance conduit and loop detectors; water and sewer line installations; two irrigation box culverts and channel lining, utility joint trench installations and other related work.