The proposed work consists of constructing a Pedestrian Bridge at the existing three pier locations. The work includes structural excavation and backfill; constructing four additional piers and two abutments and approach ramps; furnishing and placing four trusses; concrete decking; chain link fence with ADA hand rail; grading; lighting; painting and other related work.