The project consists of furnishing all superintendence, skilled and unskilled labor, materials, equipment, services, and all other necessary items for work of removal and replacement of Westchester Drive Bridge including stream bank stabilization, storm drain pipes and inlets, rip rap, curb and gutter, concrete sidewalk, road widening, traffic signal installation, and other associate paving and roadway items.