This document has expired, therefore the above link may no longer work.
The project will include but not limited to the following major categories of work: Rehabilitate Wells Nos. 12, 22, and 24, including pulling and reinstalling pumps, performing flow tests, performing chemical treatments, and neutralizing chemicals.