The project comprises the construction of: 1) Structural cast-in-place concrete including below ground wastewater chamber and potable water reservoir, 2) Insulated wood framed building with metal siding and metal roof, 3) Interior wood framed office/laboratory and foyer, 4) Interior masonry blocked walled chlorine room, 5) Pre-selected water treatment equipment including, manganese greensand filters and chemical systems, 6) Gas chlorination system and chlorine scrubber, 7) Pumping systems and piping, 8) Electrical and Instrumentation, 9) Controls and Programming, 10) Heating, Ventilation and Plumbing, 11) Site works, yard piping and utilities, 12) Systems start-up, commissioning and operator training