he project consists of, but is not limited to, the following:
~Demolition of Settling Basins 7 and 8 along with associated channels to provide recarbonation and ozone contact tanks. The Ozone Production Building will be constructed within the footprint of existing Setting Basin 8. The Ozone Destruction Building will be constructed over the ozone contact tanks. Both buildings will be masonry with metal roof system. Ozone system equipment will include liquid oxygen storage tanks, vaporizers, ozone generators, power supply units, cooling water system, calcium thiosulfate system, sample pumps and ozone destruct units.