The project consists of 2500 lineal feet of 8" ductile iron water main, 180 lineal feet of 8" HDPE water main, replacement of 26 water services, boring 170 lineal feet of 10" steel casing beneath Highway 224 and performance of such additional and incidental work as called for by the Contract Documents. The engineer's estimated project cost is $475,000.