Improvements include replacing existing water lines within the Town of Green Level water distribution
system as well as the construction of new water lines along with appurtenant hydrants and valves.Consists of the construction of a 300,000-gal elevated steel Toro-ellipsoidal design storage tank, chain
link fencing, valves and valve vault, tank telemetry system and automated control valve