The RFP Database
New business relationships start here

Water Main Extension


Oregon, United States
Government : County
RFP
Go to the link
This document has expired, therefore the above link may no longer work.

The main project work elements include the installation of approximately 3,500 LF of 18" ductile iron pipe, approximately 100 LF of 6" ductile iron pipe, none fire hydrants, ten 18" butterfly valves, one 18"x24" hot tap assembly, one 2" blowoff assembly, two combination air release valve assemblies, two 18" ductile iron 90 degree bends,...

The linked file is very large.

Additional:
http://www.ci.woodburn.or.us/publicworks/BidsandRFP/ParrRdEvergreenRd_WaterMainExtensionProject.pdf
http://www.ci.woodburn.or.us/publicworks/BidsandRFP/ParrRdEvergreenRd_WaterMainExtensionProject_Addendum1.pdf
http://www.ci.woodburn.or.us/publicworks/BidsandRFP/ParrRdEvergreenRd_WaterMainExtensionProject_PlanHoldersList_08-19-2010.pdf

    1. Home
    2. Articles
    3. Login or Register

    4. Search

    5. Add/Announce your RFP