The majority of construction consists mainly of concrete paving with a small 12'x18' attendance building with electricity and some plumbing and mechanical. There will also be new landscape that will include irrigation. A 6'-9" high retaining wall will be constructed for roll-off containers to be stored below with vehicles above to empty waste material into the containers. A new steel ornamental fence will be constructed at the perimeter of this new project.