Mandatory pre-bid meeting 08/06/1009.
WATER DISTRICT requests bids for the WATER TREATMENT PLANT REPLACEMENT PROJECT for replacing the existing Clearwell at the Water Treatment Plant with two (2) 300,000-gallon steel tanks, including site grading and piping. The Engineers Estimate is $1.2M to $1.4M.