The project consists of pavement filling and asphalt resurfacing with two asphalt courses for 1.4 miles of two-lane/three-lane roadway, 0.6 miles of concrete curb and gutter replacement, curb ramps, drive aprons, pavement repairs, replacement of detector loops, structure adjustments, new pavement markings, and associated work.