The scope of this Hollywood Hills area project consists of installing almost 100 feet of 6-inch vitrified clay pipe (VCP) and almost 1,600 feet of 8-inch VCP as well as constructing over 50 maintenance holes at existing angle points in the sewer lines and within the realigned sewer reaches.