Services from the design team will include:
1. Review and documentation of existing conditions.
2. Site Design.
3. Full design services (A through E) as defined in the Alabama Building Commission Manual.
4. Analysis of phasing options.
Total final construction cost is expected to be in excess of $50 Million.