The Military Sealift Command operates the USNS ZEUS (T-ARC 7) on a routine scheduled Dry-Dock period. Beginning on/about 01 November 2014, MSC will put the T-ARC 7 into a Regular Overhaul and Dry-docking to perform dry-docking, maintenance & repair items, annual certifications, and inspections. The main focus of this availability will be the shipyard support required to provide access, rig/ remove and ship all five Ship Service Diesel Generators (SSDGs) to a designated facility to be repaired by General Electric Co. (GE) and re-install same once repairs are complete.
See attached for additional details.
Daniel M. Glod, Contract Specialist , Phone 2026855954, Email [email protected] - Elyssa J Parana, Contracting Officer, Phone 202-685-5933, Fax 202-685-5965, Email [email protected]