The Military Sealift Command operates the USNS ZEUS (T-ARC 7) on a routine scheduled Dry-Dock period. Beginning on/about 01 October 2014, MSC will put the T-ARC 7 into a Regular Overhaul and Dry-docking with a period of performance of approximately 180 days to perform dry-docking, maintenance & repair items, annual certifications, and inspections.
Please see attached Market Survey N1024-14-0005 for requested information.