The RFP Database
New business relationships start here

USMC Air Traffic Control and Landing Systems


Maryland, United States
Government
RFP
Download the rfp file: Air Traffic Control.docx.

The ATC Systems Division performs the following: system certification; technical assistance; systems analysis and engineering; test and evaluation; requirements identification and tracking, software development, installation and maintenance; hardware design, development, installation, and maintenance; test data acquisition, reduction, and analysis; technical logistics support; configuration management; training support; equipment manufacturing, refurbishment, and overhaul and repair; quality control; and program and project management.

1.1.Scope. The contractor shall provide technical products and services in the above mentioned areas in accordance with this performance based work statement (PBWS) and Contract Data Requirements Lists (CDRLs) for the various systems under ATC Systems Division's cognizance.

    1. Home
    2. Articles
    3. Login or Register

    4. Search

    5. Add/Announce your RFP