Project Scope will include the construction of a 62,000 GSF, 3-story building addition and the
complete renovation and seismic upgrade of a 110,000 GSF, 2-story existing building. The project
scope will also include seismic retrofit, minor renovation and fire and life safety upgrades in the
occupied 100,000 GSF, 8-story tower section of the facility. Fire and life safety upgrades and minor
renovation will also occur in the occupied 120,000 GSF, 4-story section of the facility. Hazardous
material abatement is included in the project scope. Library operations are required to continue
throughout the project.
It is anticipated that funding approval will be finalized in November 2012. Construction start is
estimated to be March 2013. Estimated construction cost is in the range of $53,000,000.