Two-Story A-Wall 400


Nebraska, United States
Government : Military
RFP
Go to the link
This document has expired, therefore the above link may no longer work.

SOURCES SOUGHT SYNOPSIS: Note that this is NOT a request for quotes or proposals; the 55th Contracting Squadron, Offutt Air Force Base, NE, is seeking information for market research purposes only for the following services listed below:

This is a Sources Sought announcement. The 55 Contracting Squadron intends to contract one (1) contractor to provide all labor, equipment, materials, tools, supervision, and necessary services, to deliver and install a Two-Story A-Wall 400 plant office in Vehicle Maintenance.


The designated NAICS Code is 236220 and a Size Standard of $36.5 million.


Your response shall include the following information:
• Size of company (i.e., 8(a), HUBZONE, WOSB, Veteran Owned, Small Disadvantaged Business, Service Disabled Veteran Owned, etc.),
• Capability Statement.


Documentation of technical expertise and capability must be presented in sufficient detail for the Government to determine that your company possesses the necessary functional area expertise and experience to compete for this acquisition (see Statement of Work below). It is imperative that business concerns responding to this sources sought articulate their capabilities clearly and adequately.


The information should be sent to 55 CONS preferably via e-mail to christopher.kueff.1@us.af.mil and luis.stump@us.af.mil by 1700 Central Standard Time on 02 April 2019. If mailed, send to ATTN: Chris Kueffer, 55 Contracting Squadron, 101 Washington Sq, Bldg 40, Offutt AFB, NE 68113.


IF A SOLICITATION IS ISSUED IT WILL BE ANNOUNCED AT A LATER DATE, and all interested parties must respond to that solicitation announcement separately from the responses to this announcement. No reimbursement will be made for any costs associated with providing information in response to this announcement.

Statement of Work


Purchase and installation of a Two-Story A-Wall 400 in Plant Office for Vehicle Maintenance


1. Scope: The work covered by this Statement of Work consists of the contractor providing, all labor, equipment, materials, tools, supervision, and necessary services, to deliver and install a Two-Story A-Wall 400 plant office in Vehicle Maintenance.
2. Major Items of Work:
a. Deliver and install 1-10'X12' Two-Story A-Wall 400 with the below items.
b. 44 LIN. FT. A-WALL 400 VINYL FINISH WALL PANELS 8' HIGH
44 LIN. FT. A-WALL 400 VINYL FINISH WALL PANELS 9' HIGH
4 A-WALL 300 CORNER(S) UP TO 9' HIGH
4 A-WALL 400 CORNER(S) UP TO 9' HIGH
1 LOT VERTICAL FRAMING MEMBERS (BONE)
240 SQ. FT. 1-1/2" GALVANIZED STEEL ROOF DECK
240 SQ. FT. ACOUSTIC CEILING AND COMMERCIAL STEEL GRID
1 BDLS 6" SONOBATTS SOUND/THERMAL R19 CEILING INSULATION (LOWER LEVEL)
2 3'X6'8" WALNUT LEGACY SOUND CORE DOOR
2 22"X36" TEMPERED DOOR GLASS
2 ENTRY LEVER LOCKSET, SATIN CHROME
10 39"X44"X3/16" TEMPERED WINDOW (FACTORY GLAZED)
2 15"X44"X3/16" TEMPERED WINDOW (FACTORY GLAZED)
8 110V RECEPTACLE(S) 20 AMP, WITH FLEX-4 CONNECTOR
2 125V RECEPTACLE(S) 20 AMP, WITH FLEX-4 CONNECTOR (HVAC)
2 SPST SWITCH(S), 20 AMP, WITH FLEX-4 CONNECTOR
4 2X4 T-8 TROFFER LIGHTS, NO TUBES, WITH FLEX-4 CONNECTOR
1 EATON 12 CIRCUIT BREAKER PANEL WITH FLEX-4 DISTRIBUTION
4 DATA BOX PRE-INSTALLED WITH PULL LINE
2 FACTORY FRAMED AIR CONDITIONER OPENING
2 FRIEDRICH CHILL 8000 BTU AIR CONDITIONER (CP08) 115V
2 FRIEDRICH DRAIN FITTING(S) FOR CHILL UNITS-TUBING BY OTHERS
2 REMOTE CONTROL FOR FRIEDRICH HVAC UNIT
6 SHEET(S) OF 3/4 " T & G PLYWOOD W/SCREWS
4 10' C CHANNEL(S) WITH BRIDGING & HANGERS (8" DEPTH)
1 8" C CHANNEL/BOX BEAM SET UP/FUEL CHARGE
1 DETAILED DRAWINGS AND ASSEMBLY INSTRUCTIONS
2 SIDE MOUNT FIRE SUPRESSION SPRINKLER HEADS (1 ON EACH LEVEL)
1 (IBC) L-SHAPED STAIR WITH TOP LANDING TO 9'2.375 TOP OF DECK
3. Inspection of building site: Any interested contractor(s) shall have the opportunity to participate in a Site Visit to inspect the building site by notifying Contracting of desire to do so. The date and time are to be determined and will be provided to interested contractors. All participants will be escorted onto base and transported to the Vehicle Maintenance. The inspection time shall not exceed two (2) hours.
4. Location of Work: All work will be performed at Vehicle Maintenance.
5. The contractor shall notify the Contracting Officer in writing if, during inspection and/or performance of work, additional funds are needed. The contractor shall not complete any other items outside the Scope of Work unless provided written authorization by the Contracting Officer.
6. Materials and Equipment: All materials and/or equipment shall be provided by the contractor installing the building.
7. Period of Performance shall be 21 days for the completion of work.
8. Warranty: The contractor shall provide a parts and labor warranty for a minimum of one year against defects and workmanship.
9. Clean Up: Any debris and/or trash shall be removed from the installation site prior to the contractor completing the work.
10. Hazardous waste disposal: The contractor shall properly dispose of any hazardous waste that was produced during the installation process.
11. Inspection: An inspection of the building installation shall be conducted by designated 55 LRS/LGRV personnel and the contractor prior to acceptance of the building.


 


Christopher Kueffer, Contracting Specialist , Phone 4022325992, Email christopher.kueffer.1@us.af.mil